Bill every change on your data center jobs.
We read your subcontract, RFIs, drawing revisions and job email, then hand your team a sourced list of unbilled extra work and every contract notice deadline, before the window closes.
- Electrical
- Div 26
- Mechanical
- Div 23
- Commissioning
- 01 91 00
On a data center job, scope moves every week. The paperwork doesn't keep up.
Owners and GCs are buying schedule. The extra work is real, but it gets done long before anyone prices it.
Direction arrives sideways
An RFI answer adds conduit. An ASI moves a CRAH pad. A superintendent asks for a weekend shift by email. None of it is a change order yet.
Notice clocks start without warning
Most subcontracts give you a fixed window to send written notice of a change or delay. The clock starts at the directive, not when someone notices.
Fast-track hides the gap
Hyperscale schedules overlap design and construction. Sheets turn faster than any PM can check them against scope and the change log.
Findings your PM can act on in minutes.
Not a dashboard to log into. Each finding is one record: what changed, where it came from, why it looks like extra work, and when notice is due.
- Unbilled extra workWork that looks outside your scope and isn't on your change log yet.
- Notice calendarEvery clause that starts a clock, what it requires, and the date it runs out.
- A source for every lineThe exact sheet, RFI, ASI or email, quoted, so nothing rests on our word.
Added busway runs to Data Hall 2
“Provide (2) additional 4000A busway runs to Data Hall 2 per revised layout.”ASI-014, Sheet E-401 rev 3, cloud △3
- Bid set
- E-401 rev 0 shows a single feed. No added runs.
- Scope
- Not listed in the Exhibit B scope of work.
- Change log
- No matching PCO or change order request.
- Notice
- Changes clause: written notice within 7 days of the directive.
- Due
- In 4 days
The whole job record, not just the contract.
Extra work hides in the gaps between documents. We read them together.
Subcontract forms: AIA A401, ConsensusDocs 750 and GC custom forms, with every exhibit and rider.
- 01
Subcontract
Scope, changes and notice clauses, exhibits, riders and flow-down terms.
- 02
Specifications
Division 26, 23 and 01 91 00 sections, and the revisions to them.
- 03
Drawing revisions
Clouded and delta-tagged changes, sheet by sheet against the bid set.
- 04
RFIs
Answers that add, move or upsize work.
- 05
ASIs and bulletins
Supplemental instructions from the architect and engineers.
- 06
Change log
Your PCOs, change order requests and executed change orders.
- 07
Job email
Directives from the GC, owner's rep and superintendents.
- 08
Schedule updates
Resequencing, acceleration and delay that change your costs.
One job. Four steps. Nothing new for your team to learn.
It's done for you. We work from the documents you already keep.
- 1You
Pick one job
An active data center job, ideally under construction with changes in motion.
- 2Both
NDA and handoff
We sign your NDA. You share the subcontract, logs, drawings and job email by folder or export.
- 3Us
The review
We read every document, compare each change to your scope and change log, and check every item against its source.
- 4You
Your call
You get the findings and the notice calendar. Your team decides what to send, and when.
We track the build-out, job by job.
Our research follows U.S. data center projects from announcement through construction, using public approvals, filings and news.
- Projects tracked
- 580
- Approved or under construction
- 244
- Capacity on active jobs
- 81.83 GW
- States with active jobs
- 39
Active jobs by state
Top 10- TX52
- VA15
- SC14
- CA10
- OH10
- IL9
- PA9
- GA8
- IN8
- CO7
Projects by stage
- Announced102
- Approved56
- Under construction188
- Operational65
- Blocked or paused36
Counts are projects found in our latest research run from public sources, not every project in the market.
Built for how trade contractors actually run jobs.
- Sourced, not guessed
- Every finding quotes the sheet, RFI or email it came from. If we can't source it, it isn't in the report.
- Done for you
- No software rollout, no logins for your PMs, no training.
- Your call
- We find and document. Your team decides what to submit and when.
- Confidential
- We sign your NDA before you share a single document.
Questions contractors ask us.
Which jobs are a good fit?
Active data center jobs (hyperscale, colocation or enterprise) where you hold an electrical, mechanical or commissioning subcontract and changes are arriving faster than they're being priced.
What do you need from us?
The subcontract with its exhibits and riders, your change log, RFIs, ASIs and drawing revisions, and email for the job. Whatever format you already keep them in is fine.
Which subcontract forms do you work with?
AIA A401, ConsensusDocs 750 and GC custom forms. We read the version you actually signed, including every exhibit and rider.
Do we have to switch software?
No. It's done for you. We work from the documents you already have, and nobody on your team has to learn a new tool.
Can we sign an NDA first?
Yes. Send us yours, or ask for ours, before you share any documents.
How is it priced?
We start with one job and quote it up front once we know its size and how much material there is. Tell us about the job and we'll come back with a price.
Does this replace our project manager or attorney?
No. We find and document possible extra work and deadlines. Your team decides what to submit, and we don't give legal advice.
Tell us about one job.
Send a few details and we'll set up a short call to see whether a review makes sense for it.
- One active job to start
- NDA before any documents
- Every finding tied to its source
- Your team decides what to bill